Virginia septic inspection report

Va. Code § 59.1-310.9 says who may inspect a septic system for a Virginia sale, what the contract and report must cover, and that the report can’t say pass or fail.

At a glance

Law
Va. Code § 59.1-310.9
Who can inspect
Licensed operator, installer, or soil evaluator
Report due
10 business days
Pass or fail
Not allowed

Completed example

Download PDF
Only three licenses qualify
Virginia narrowed the field. Under § 59.1-310.9, only a person holding an onsite sewage system operator, installer, or onsite soil evaluator license may inspect a septic system in connection with a real estate deal, refinancing included. A general home inspection doesn’t count.
Those licenses come from Chapter 23 of Title 54.1, the onsite sewage professionals chapter.
This section was amended in 2025 and again in 2026, so older templates may be out of date. Breaking it is a Class 3 misdemeanor under § 59.1-310.10.
Check the license before you send a sub. A pump truck driver without one of those three licenses can pump the tank, but can’t sign the real estate inspection.
The contract and the pumping question
Before you inspect, get a written contract signed by the client. It sets the scope and cost, gives you permission to inspect, and states that a complete inspection requires pumping the tank.
Some sellers don’t want to pay for a pump-out. That’s allowed, but write it down. The law asks you to document the client’s decision to decline pumping. On a house in Midlothian closing in two weeks, that note protects you when the tank turns out to be full.
If pumping is extra, price it as its own line. The client sees exactly what declining saves, and you have a record they chose.
What you look at
Inspect every component that’s readily accessible or can be opened: septic tanks, pump tanks, distribution boxes, treatment units, control panels, and dispersal fields. Check any parts the operation permit calls for. Look at vegetation, grading, and signs of water getting in where it shouldn’t.
“Readily accessible” has a limit. Under § 59.1-310.7, it doesn’t include removing more than 30 inches of soil or other surface material. A tank buried 40 inches down is something you report as not inspected, with the reason.
What you don’t have to do. You aren’t required to find property lines, give warranties, figure out whether the system is big enough, run a system that won’t respond, clear heavy brush or debris, or look for environmental hazards.
What it isn’t. It’s not a soil suitability evaluation. Soil notes are limited to what you can see: saturation, surfacing, and ponding.
Photograph each open component and the field surface. The photos back up your “operating as intended” line.
What the report says, and what it can’t
The written report goes out within 10 business days from the start of the inspection unless the client agrees in writing to a different time. It names what you inspected, what you didn’t and why, any adverse conditions, and whether the system was operating as intended.
Ten business days is two calendar weeks. Count from the day you started on site, not the day the pumper’s notes reached you.
For each problem, describe what could happen and recommend further evaluation. Report the system’s size or design capacity, in gallons per day or bedrooms, from local health department records. If you can’t find it, recommend how to find out. Note whether a licensed operator is required, and refer the client to the health department for operation and maintenance reports.
Write adverse conditions as facts, like “effluent at the surface over line 2,” not as grades.
No pass or fail. The law bars pass or fail and graded ratings, and it bars hydraulic load tests. The VDH buyer page still mentions loading tests, but for a real estate inspection, the statute now rules them out.
Where do you find the design capacity?
Start at the local health department. VDH says it holds permits with the design capacity, inspection reports, operation permits, as-built drawings, and maintenance records. Homes are designed at 150 gallons per day per bedroom, so a three bedroom permit shows 450 gallons per day. Alternative systems need a yearly visit from a licensed operator, so ask for those reports too.
VDH also suggests a deed search. Conditional permits, waivers that become void when the property sells, easements, and recorded notices for alternative systems can all turn up there. It recommends inspecting several weeks before closing and pumping every 3 to 5 years, which the Chesapeake Bay Preservation Area requires for conventional systems.
Noma specializes in the Virginia Septic Inspection Report (Va. Code § 59.1-310.9). Clients book online, your contract goes out once as a reusable document for e-signature on every job, and reports use your own sections with the worst defects in the summary. See how Noma runs septic inspections.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.