On-Site Sewage Treatment System Inspection Report

DEQ Form 641-576AS is the final inspection an Oklahoma certified installer sends the local DEQ office after putting in, changing, or repairing a septic system.

At a glance

Required by
OAC 252:641-21-12
Filled out by
DEQ certified installer
Due
Within 15 working days after the work
Pages
1, on DEQ Form 641-576AS

Completed example

Download PDF
What is DEQ Form 641-576AS?
It’s the final inspection report for septic work in Oklahoma. Under OAC 252:641-1-3(a), every new system, modification, and repair is inspected before it’s backfilled or used, either by DEQ or by a certified installer who self-inspects. That installer signs this one-page form. DEQ’s own PDF and Word copy are the copy of record.
It isn’t a home sale report. Oklahoma has no statewide septic inspection at sale, and a home inspection report leaves the septic out. A buyer who wants the state to look orders DEQ’s Existing System Evaluation on Form 641-005, listed at $357.28 through June 30, 2027. For an alternative system, the owner signs Form 641-581 Sup, promising to hand the next buyer the permit and this final inspection.
When is it due?
Within fifteen working days after the work is done. OAC 252:641-21-12(a)(2) says the certified installer sends an accurate, completed 641-576AS to the local DEQ office in that window. DEQ charges $30 each time one is late or never sent.
The clock starts before you dig. Tell the local DEQ office the time, date, and location of the job before construction begins, so DEQ can come look, or pay $50. Keep your records of each system for three years.
How to fill it out
Fill in Section I from the deed. Owner, mailing address, email, and the property address. The legal description wants the quarter calls, section, township, and range, or the lot, block, and subdivision for a platted lot. Add the GPS point in decimal degrees.
Fill only the rows you built. Check the type of work and whether it’s an alternative system, then fill the tank sizes. An aerobic unit gets its gpd rating, its NSF 40 or 245 box, the model, and the maker. Leave drip, spray, lagoon, or trench rows blank when the system doesn’t have them.
Sketch it with every distance. Draw the house, the tanks, the field, and the well with DEQ’s symbols from the legend, and size the field the way the soil test on Form 641-581 called for. Label the distances that matter under Appendix E of the rules, such as 50 feet from tanks and spray heads to a private well, and 10 feet from spray heads to the property line.
Certify, then leave Section IV alone. Print your name, sign, and add your installer certification number and the date in Section III. Section IV is DEQ USE ONLY. Pull the current form from the DEQ forms page if you’re ever unsure you have the latest revision.
Who tracks the fifteen-day clock?
Usually nobody. The install wraps up, the crew moves to the next lot, and the form sits in the truck until DEQ’s $30 late fee shows up.
Noma specializes in the On-Site Sewage Treatment System Inspection Report (DEQ Form 641-576AS). Put each install on the schedule as a job, then send the invoice and take payment online when the work is done. See how Noma runs inspection jobs.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.