Indiana onsite sewage system inspection report

Indiana has no statewide septic form for home sales. Your report should measure the system against the state’s definition of failure in 410 IAC 6-8.3-33 and against the county’s file.

At a glance

Rule
410 IAC 6-8.3
Failure defined
410 IAC 6-8.3-33
Permits
County health department
Home inspectors
Not required to inspect septic

Completed example

Download PDF
Why buyers order one
No state law makes an Indiana seller get a septic inspection. Indiana’s rule for home systems, 410 IAC 6-8.3, covers design, installation, permits, and failure, but not property transfers. The request usually comes from a lender, a purchase contract, or a county with its own rule.
The Indiana Department of Health runs the state’s onsite sewage systems program, and local health departments issue the permits and do most of the work on the ground.
It also doesn’t come from the home inspection. Indiana’s home inspection standards say private waste disposal systems aren’t required. Some home inspectors add septic as an extra service in their inspection agreement. Many buyers hire a septic installer or pumper instead.
Start at the county. Local health departments issue the permits and keep the files. Ask for the permit, the as-built drawing if there is one, and any operating permit records. Then you know what should be in the ground before you open a lid.
The three signs of failure
The most useful part of the rule for an inspector is section 33. It defines a failed system with three signs. If you see any one of them, write it down plainly.
It won’t take sewage. The system “refuses to accept sewage at the rate of design application,” and that interferes with normal plumbing. Slow drains through the whole house and gurgling toilets are the field signs.
It surfaces. Effluent goes beyond what the soil can absorb, “resulting in ponding, seepage, or other discharge” to the ground surface or surface waters. On a Valparaiso lot with heavy clay, that’s often a soggy, smelly strip over the last trench in spring.
It contaminates water. Effluent contaminates a drinking water supply, ground water, or surface water.
The rule then says, “A failed residential on-site sewage system is a health hazard.” Under section 55, the owner has to fix a failure within the time the health officer sets. That’s why your words matter. “Possible failure” and “failure under 410 IAC 6-8.3-33(2)” lead to very different phone calls.
Write which sign you saw and exactly what it looked like. Photos of wet ground, the date, and how much it rained in the past few days help a health officer decide.
Reading the county file and the tank
Some counties use operating permits under section 54. When they do, permits for systems with parts that need scheduled maintenance, like pumps or treatment units, renew at least every three years. Others renew at least every five. The records list the service company and its contract. If the house has one, ask the seller for the latest service report.
Where a county uses operating permits, the owner has to send the health department written proof of all inspection and maintenance within one month, plus a copy of the maintenance contract. Section 55 also lets the health officer order repair of any part that’s defective, malfunctioning, or in need of service, not just a full failure.
At the tank, check what newer rules expect. Section 63 says tanks buried below grade get risers over the access openings, with covers that are watertight and fastened down. Section 64 requires an outlet filter in new systems and in old ones that need a new tank. A 1985 tank with no riser and no filter isn’t a violation by itself, but it’s worth noting, and a buyer may want to add both.
Measure the tank. Indiana’s rule doesn’t set a percentage for when to pump. Write the sludge and scum depths in inches, the tank size, and when it was last pumped, and give your recommendation in plain words.
As a rough check, a tank with 54 inches of liquid depth that holds 16 inches of sludge and 4 of scum is more than a third solids. That’s a fair time to recommend pumping.
Who needs your report before closing?
The buyer, both agents, the lender, and sometimes the county. If you found a failure, the county is the one that sets the repair deadline, so the clearer your notes, the faster everyone moves.
Put the county permit number and install year at the top of the report.
Noma specializes in the Indiana onsite sewage system inspection report (410 IAC 6-8.3). Write the report with your own sections on your phone, draw the tank and field on site, and send the invoice with an online payment link. See how Noma runs septic inspections.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.