Minnesota existing septic compliance worksheet

Take field notes for an existing Minnesota septic system, then use the MPCA form for the compliance inspection.

At a glance

Rule
Minn. R. 7082.0700, subp. 4
Official form
MPCA existing system inspection form
Send
Within 15 days of a compliance inspection

Completed example

Download PDF
Ask for the tank and soil records early
An existing system inspection starts with health and safety, then looks at protection of groundwater and other compliance points. Under Minn. R. 7082.0700, septic compliance inspections, you can use a suitable tank integrity assessment made within the last three years, subject to the rule’s exceptions. Older soil records have their own requirements.
Put each finding in the right part of the state form
The worksheet gives you a place to tie the tank, soil evidence, and hydraulic findings to the parts of the system. Use the MPCA existing system inspection form and the local attachments to issue the certificate or notice.
Send both copies on time
The signed compliance certificate or notice goes to the owner or agent and to the local unit with jurisdiction within 15 days. Keep the signed submission and the source records together.