Missouri onsite wastewater inspection and evaluation report

When a lender or buyer asks for a septic check on a Missouri home, the work falls under 19 CSR 20-3.070. A DHSS-licensed inspector picks either an inspection or an evaluation, never both, and files the report with the state within 30 days.

At a glance

Rule
19 CSR 20-3.070
Agency
Missouri DHSS Onsite Wastewater Program
Submit to DHSS
Within 30 calendar days
Keep a copy
At least 3 years

Completed example

Download PDF
Inspection or evaluation: you pick one
About a quarter of Missouri homes run on onsite systems, according to DHSS, and most local agencies no longer check them when a house sells. When a lender, buyer, owner, or agent asks for one, a state-licensed inspector does the work under 19 CSR 20-3.070, and the report comes in one of two kinds.
Inspection. The full job: tanks, the soil treatment area, signs of failure, a look at soil limits, and a hydraulic load test that runs water through the system.
Evaluation. Tanks, the soil treatment area you can see, and signs of failure. No hydraulic test. The DHSS training manual limits evaluations to a few cases: the system hasn’t been used for 6 straight months, the house has been empty more than 60 days, the soil treatment area is on a neighbor’s land and you can’t get access, or a new system went in on an exempt property in the last 6 months.
The rule is blunt: “Combining inspection and evaluation procedures or forms is not acceptable.” Choose one, use that form set, and label the report clearly.
Two more rules from the training manual shape the job. Items marked with an asterisk on the DHSS checklists are critical, so a problem there is a defect, not a note. And only the inspector who did the original inspection may do the re-inspection after repairs.
Getting and keeping the license
The license is personal. It goes to one person, not a company, and can’t be transferred. To get it, you pass a basic installer course and the licensed inspector course with at least 70 percent, then send DHSS the application with a $90 fee. It lasts 36 months. The first renewal takes 20 continuing education units, and later ones take 12.
Under 19 CSR 20-3.070, no person without a license may do “any part” of the work, even under a licensed inspector’s supervision. And your license number goes on everything: bids, proposals, contracts, invoices, inspection reports, evaluation reports, and other letters.
On the property
Don’t assess a system installed less than 6 months ago, and don’t do a full inspection unless it’s been in use for 6 months in a row. Expose the tanks. The DHSS training manual says pumping is recommended but not required.
Hydraulic load test. The volume depends on bedrooms: 120 gallons for one or two, 180 for three, 240 for four, and 60 more for each bedroom after that, added at about 5 to 10 gallons a minute. Count bedrooms as no fewer than the real estate listing shows. A three-bedroom lake house in Camdenton gets 180 gallons even if the seller calls one bedroom an office. For an evaluation, you add up to 50 gallons, just to confirm the fixtures are connected.
Water and neighbors. If the house has a private well, the job includes a bacteria test of the water and a look at the visible parts of the well. If any part of the system sits on a neighbor’s land, tell the neighbor and get permission before you go on their property.
What happens after you leave the site?
Write the report on the DHSS forms: site information, assessment results, the checklists for each part, and a site diagram, all under one job number. State each defect clearly. Then send it within 30 calendar days, with the water results, to the DHSS Onsite Wastewater Program at OnsiteProgram@health.mo.gov or PO Box 570, Jefferson City, MO 65102. Copies also go to the local authority, the person who asked for it, and the owner. Keep your own copy at least 3 years.
DHSS audits inspectors, so expect the department to compare your report to the site now and then. A clear site diagram and plain measurements make that easy.
Tell the owner in writing that they don’t have to hire you for repairs or the re-inspection. And if the system fails, the state doesn’t require it to meet today’s standards to sell, though the county or city might.
Noma specializes in the Missouri onsite wastewater inspection and evaluation report (19 CSR 20-3.070). Take bookings online, work the site visit in the Noma mobile app with an inspection diagram of the tanks and soil treatment area, and send the invoice from the same job. See how Noma runs septic inspections.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.