Colorado septic transfer of title inspection report (Regulation 43)

Some Colorado counties make a seller get the septic system inspected before closing. Regulation 43 says what the report must show, and each county decides if it applies.

At a glance

Rule
5 CCR 1002-43, section 43.4.L
Who inspects
NAWT-certified or approved equal
Form
Supplied or approved by the local agency
Example fee
Boulder County certificate, $500

Completed example

Download PDF
First, does your county even require one?
Colorado’s septic rule is Regulation 43, the On-site Wastewater Treatment System Regulation at 5 CCR 1002-43. Section 43.4.L covers transfer of title inspections. The catch is that it’s optional. Each local board of health decides whether to adopt it.
Counties run the septic program day to day. The state health department’s OWTS page says local agencies permit systems that handle 2,000 gallons per day or less, and their rules must be at least as strict as Regulation 43. So call the county health department before you quote. Some counties require a transfer inspection, many don’t, and a lender may still ask for one either way.
What the report has to include
When a county does use 43.4.L, the inspector must be certified by NAWT, the National Association of Wastewater Technicians, or hold an equal certification the local agency approves. The report goes on a form the local agency supplies or approves. Here’s what Regulation 43 wants in it:
Owner and property. The owner’s name and contact info, the physical address, and the legal description.
Inspector and visit. Your name, your NAWT number, and the date and time of the inspection.
A record drawing. A drawing of the system as it sits on the lot.
Each component. The size, type, and capacity of the tank, the pump chamber, and the soil treatment area.
Recent work. A tank inspection from the last 12 months with the pumping receipt. Reports on mechanical parts and the soil treatment area from the last 12 months too.
Problems. Every part that isn’t working. Also whether the system crowds the setback from a well. If a buried well or snow keeps you from checking, the report has to say so.
One more rule with teeth: a cesspool can’t stay in service once a transfer inspection finds it.
A typical walk through the system
Regulation 43 says what the report must hold. How you gather it is up to you and your county. A typical visit goes like this.
Start with the paperwork. Pull the county permit file before you go. It often has the original design drawing, the tank size, and the soil treatment area layout. That saves you from guessing where the field is.
Find and open the tank. Dig to the lids if they aren’t at grade. Check the inlet and outlet baffles, look for cracks, and watch for water running back from the field into the tank, which can mean a saturated field.
Check anything with a motor. If there’s a pump chamber, test the pump and the high-water alarm. Note the alarm’s location so the next owner can find it.
Walk the soil treatment area. Look for wet spots, sewage on the surface, unusually green strips of grass, and anything parked or built on top of it. Measure to any well and to the house.
Draw it before you leave. The record drawing is part of the report, so sketch it on site with distances while the lids are still open.
How it plays out in Boulder County
Boulder County adopted its transfer rule in 2008, and its property transfer page spells out the steps. After a passing inspection, the seller gets a certificate from Boulder County Public Health. The fee is $500, paid to BCPH at 3450 Broadway in Boulder. It can take up to 10 business days, and the county won’t rush it.
If the system fails, the seller has three paths. Fix it under a permit before closing. Or get a conditional certificate by signing a notarized Agreement to Repair, which gives 365 days to finish repairs, or 2 years if the fix is hooking up to sewer.
Some sales are exempt. Examples are systems installed and finaled less than 5 years ago, transfers between spouses, transfers into a trust in the same name, and foreclosures.
What if the pumping receipt is too old?
This is the snag that blows up closing dates. The rule wants a tank inspection and pumping receipt from the last 12 months. If the seller last pumped 14 months ago, the tank gets pumped again before your report can finish. Ask for the receipt when the job is booked, not on site.
Noma specializes in the Colorado transfer of title inspection report (5 CCR 1002-43, section 43.4.L). Sellers or agents book online, you draw the record drawing on the job in the app, and the invoice goes out so it’s paid before closing. See how Noma books septic inspections.