Existing Cesspool Information Form

The Hawaii Department of Health’s cesspool card, copied word for word, that a licensed engineer, contractor, plumber, or architect fills out and signs after opening the cesspool.

At a glance

Required by
HAR § 11-62-36(b)
Filled out by
Licensed engineer, contractor, plumber, or architect
Sent to
DOH Wastewater Branch
Due
When DOH asks for one

Completed example

Download PDF
What is the cesspool card?
It’s the Department of Health’s one-page Existing Cesspool Information Form. It records where the cesspool sits, how wide and deep it is, how it’s lined, and how to reach it, with a plot plan and a photo of the top with the cover off. In Hawaii, this is the inspection report for a cesspool, not a septic tank and drainfield.
Under HAR § 11-62-36(b), the card “shall be completed and signed by a licensed engineer, contractor, plumber, or architect.” DOH’s card has no form number or revision date. The DOH PDF is the copy of record; ours copies it word for word so you can type into it.
When do you need one?
When DOH asks. The rule says “The director may require a cesspool card from an owner whose cesspool has no cesspool card on file with the department.” The DOH Wastewater Branch FAQ says that when a property has a cesspool and the branch has no records, it will require one.
No Hawaii rule requires a cesspool inspection when a house sells. But HRS § 342D-72 says every cesspool not granted an exemption must be upgraded, converted, or connected to a sewer before January 1, 2050. DOH warns that a new owner is “held accountable for bringing the system into compliance,” with fines up to $60,000 per offense. That’s why buyers ask for a card when a home inspection report turns up a cesspool.
How to fill it out
Start with the TMK. Fill in the tax map key, lot number, owner, address, and bedrooms, then the engineer and contractor. Most old cesspools have no IWS permit number, so say so instead of leaving the line empty.
Open it and measure. Record the distances to the building and the property line, the cesspool and cover diameters, and the depth, which DOH says “shall be measured from inlet piping to the bottom of the cesspool.” Then circle the access, port, and water answers, and fill in the lining and cover depth.
Check the pumping record before you sign. The certification says the cesspool is functioning, “has not been pumped within the last twelve months,” and doesn’t discharge directly into the groundwater. If it was pumped last month, you can’t sign that truthfully.
Attach the photo and draw the plot plan. Take the photo with the cover off, as the card asks. Sketch the house, the cesspool, the property lines, and the two distances in the space at the bottom, then send it all to the Wastewater Branch.
Do you have to fill it in by hand?
DOH’s file is a flat PDF with nothing to type into, so most cards get filled in with a pen on a tailgate. Then someone retypes the measurements into an invoice and an email to the buyer’s agent.
Noma specializes in the Existing Cesspool Information Form (HAR § 11-62-36). Noma runs the jobs, scheduling, invoices, and online payments for inspection companies, so the cesspool visit is booked, done, and paid for in one place. See how Noma runs inspection jobs.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.