Termite Inspection Report, Existing Construction

Hawaii’s Termite Inspection Report, the PC-9, is the Pest Control Board’s four-page form that a statute requires before termite contract work, and the one Hawaii home sales use for termite inspections.

At a glance

Required by
HRS 460J-19(b)
Filled out by
BR-1 or BR-3 PCO, RME, or field rep
Signed by
The PCO or RME (item 24)
Kept
2 years after the termite work

Completed example

Download PDF
What is the PC-9?
It’s the Pest Control Board’s Termite Inspection Report for existing buildings, form PC-09, revision 0815R. Most states set their termite form by rule. Hawaii does it by statute: HRS 460J-19 says the written report “shall be on a PC-9 form prescribed by the board.” Hawaii doesn’t use the NPMA-33.
The Board’s file is an XFA form, so it often won’t open in Chrome, Preview, or a phone. Ours copies its 24 items, numbers, and words on four Letter pages. The Board’s own PDF is the copy of record.
When do you need one?
Before any termite contract work. HRS 460J-19(b) says no work starts until the PC-9 and a written estimate are approved by the person asking for it, unless a live infestation exists. Home sales use it too, because purchase contracts and lenders ask for it. The 15-day limit in item 14 is printed on the form, not set by a statute or rule.
A PCO or RME licensed in BR-1 or BR-3 signs it, per HAR 16-94-73 and the Board’s FAQ. A field rep can inspect under that licensee’s supervision. Keep the report two years after the termite work is done (HRS 460J-15(a)(9)).
How to fill it out
Get the history first. HAR 16-94-73(d) has you ask the owner about past termite work, and in a sale, get the seller’s disclosure statement. That’s item 9. Check “YES” in 9(c) only if you actually received it.
Say what you couldn’t reach. HAR 16-94-70 wants every area you didn’t inspect, and why. Low crawl space corners under 24 inches, stored items, and covered floors go in item 19.
Mark both termites. Item 20 has a line for drywood and one for subterranean. Write where each one is, then put the same spots on the page 4 sketch with a description of the building. It doesn’t need to be to scale.
Recommend, then sign. HAR 16-94-71 requires recommendations, so number them in item 21(a) and list the conducive conditions in 21(b). The PCO or RME signs item 24 and checks BR-1 or BR-3.
Can sellers approve the estimate before escrow closes?
They have to. Nothing gets tented until the written estimate is approved, and with a 15-day report and a closing date, a paper copy sitting in someone’s inbox costs you the tent slot.
Noma specializes in the Termite Inspection Report, Existing Construction (PC-9). Upload your estimate once as a reusable contract, and Noma sends it for e-signature the moment the treatment is booked. Schedule, invoice, and collect payment for the job in the same place. See how Noma sends estimates for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.