Wood Destroying Insect Inspection Report

Maryland’s Form MD-1 is the state’s own two-page termite report for a home sale or loan, and MDA says it can’t be altered.

At a glance

Required by
COMAR 15.05.01.14B
Filled out by
Employee of an MDA-licensed pest firm
Good for
90 days for a loan or settlement
Kept
2 years by the company

Completed example

Download PDF
What is Form MD-1?
It’s Maryland’s Wood Destroying Insect Inspection Report, the two-page termite report for any home sale or real estate loan. Page 1 holds the findings and both signatures. Page 2 is the consumer information, including the 90-day line, and the buyer signs that they got both pages.
Use MD-1, not the NPMA-33. MDA’s October 2022 newsletter says it hasn’t adopted the newer NPMA-33, that MD-1 can’t be altered, and that an altered copy brings an automatic civil penalty. Ours is a retyped convenience copy. MDA’s own scan of MD-1 is the copy of record.
When do you need one?
Any termite inspection tied to a property transfer or a real estate loan. That’s COMAR 15.05.01.14B. It’s pest control under COMAR 15.05.01.01, so MDA’s 2007 notice says only an employee of an MDA-licensed pest firm can do it. A home inspector can’t sign one on their own.
Page 2 says the report is invalid for a mortgage or settlement if it isn’t used within 90 days. The rule adds that you keep a copy 2 years and show it to MDA on request. MDA sent proposed changes to .12 through .14 to the legislature in September 2026, but the rule above is the one in force today.
How to fill it out
Decide what you inspected. What you list under Structure(s) Inspected sets the rest. MDA’s 2010 newsletter says that if you list only the house, termites in a woodpile out back go in Section V, not box B.
Check A or B, then the items. Under B, check live insects, dead insects and tubes, or damage, and write where. If you know the damage was fixed or will be looked at, say so in Section V. Otherwise the form says you don’t know.
Name what you couldn’t reach. Section IV has eight areas and a key of 24 reasons, from fixed ceiling to duct work. A line like “6, 7: east wall behind shelving and boxes” is enough.
Attach the diagram, then sign. The rule wants a diagram of where you found evidence, and MDA says extras go in Section V or on a separate sheet, never on the form. Our third sheet is that diagram, and a later inspection updates it.
Can the seller sign the contract before the crew arrives?
When an MD-1 turns up live termites, the seller needs a termite contract signed fast, and the 90-day clock is already running. Chasing a paper copy back from a seller who has moved out eats days.
Noma specializes in the Maryland Wood Destroying Insect Inspection Report (Form MD-1). Upload your termite contract once, and Noma sends it for e-signature the moment the treatment is booked. Schedule, invoice, and collect payment for the job in the same place. See how Noma sends contracts for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.