Termite Pretreat Plot and Meter Box Sign

In Mississippi, a termite company gives the owner of a pretreated home a plot with its dimensions and shape, and posts a sign on the electric meter box after the perimeter treatment, under Rules 115(11) and 118.05(1).

At a glance

Required by
MDAC Rules 115(11) and 118.05(1)
Filled out by
The licensee and technician
Goes to
The structure owner and the meter box
Sign size
At least 3.5 by 1 inch

Completed example

Download PDF
What is a pretreat plot and meter box sign?
The plot is a drawing of a pretreated home with its dimensions and shape, given to the structure owner. The sign is a small tag the technician posts on the outside electric meter box once the perimeter is done. Both come from MDAC’s rules for termite work.
MDAC prints no form for either one. Rule 115(11) asks for “a complete plot or diagram giving the dimensions and shape of the property pretreated,” and you keep a copy. The guarantee is a separate paper, the pretreatment contract you give the builder.
When do you fill it out?
At each phase. Log the horizontal barrier before the pour, then the perimeter at final grade. Rule 116 has you put each phase on the monthly report with the subdivision name, lot number, and city, due by the 20th of the next month.
The perimeter within a year. Rule 118.05(1) says “All perimeter treatments must be performed within one year of treatment of the horizontal barrier.” The sign goes up when the perimeter is done, and that’s a good day to hand the builder the plot.
How to fill it out
Start with the lot. Write the street address, the subdivision, and the lot number, since that’s how the monthly report finds the job. Copy the termiticide’s brand name, EPA Reg. No., and dilution off the label.
Log both phases. Give each its date, the area treated, the gallons of dilution, and who applied it. The Termidor SC label, for one, calls for 1 to 1.5 gallons per 10 square feet under a slab and 4 gallons per 10 linear feet per foot of depth at the perimeter.
Draw it with its sizes. Outline every slab, porch, and patio and write its dimensions. Trace the perimeter line, mark the meter box, and note the total square feet and linear feet so the owner can read the shape without a ruler.
Print the signs at actual size. Each one comes out 3.5 by 2 inches, over the 3.5 by 1 inch minimum. Fill in the four items, laminate it so it lasts outdoors, and post it on the meter box. A licensee or employee who removes a posted notice breaks the rule.
How do you keep a subdivision’s lots straight?
A builder can have a dozen lots going in one phase. Each has a barrier date, a perimeter due within a year, and a line on two different monthly reports. Lose one lot and its perimeter slips past the year.
Noma specializes in the Termite Pretreat Plot and Meter Box Sign (Rules 115(11) and 118.05(1)). Schedule each phase as its own job, then invoice the builder and take payment online. See how Noma schedules and bills termite work.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.