Termite Pretreatment Contract

A Mississippi termite pretreatment contract goes to the builder and has to say in bold that damage repairs are included and the perimeter is due within a year, under MDAC’s Rule 115(6).

At a glance

Required by
MDAC Rules 115(6) and 115(10)
Filled out by
The WDI licensee
Signed by
Licensee and builder
Due
With the pretreatment

Completed example

Download PDF
What is a Mississippi pretreatment contract?
It’s the contract a wood destroying insect licensee issues to the builder when the soil under a new home is pretreated for termites. MDAC’s builder brochure says state law requires one guaranteeing the pretreat for at least a year. The brochure still cites an old “Regulation 15A,” so go by the rule book.
Unlike a regular termite contract, a pretreat contract can’t be retreatment only. Rule 115(6) wants it to say in bold that damage repairs are included and that the perimeter is due within one year of the horizontal barrier. Like the rest of Rules 115 to 120, it covers WDI licenses and permits only.
When is it due?
With the pretreatment. Get it signed before the horizontal barrier goes down, because that’s when the clock starts. Under Rule 118.05(1), every perimeter treatment has to be done within one year of the horizontal barrier.
Rule 115(10) adds an inspection before the contract expires. And each phase goes on your monthly WDI report when it’s done, with the subdivision, lot, and city (Rule 116).
How to fill it out
Name the builder and the lot. The contract goes to the builder, so put their name on it. Add the subdivision and lot, since that’s how the monthly report finds the job before it has a mailbox.
Leave the bold statement alone. Page 1 prints Rule 115(6)’s words in bold in a heavy box. Don’t cross anything out. If your company won’t include repairs, it can’t write a Mississippi pretreat contract.
Fill in each phase as you go. The table follows the phases Rule 116 names: footing, horizontal barrier, dried-in, and exterior perimeter. Write the area and the gallons off your work sheet, and check them against the label rate.
Close out at final grade. After the perimeter, the technician posts the meter box sign, and the structure owner gets a plot or diagram under Rule 115(11). Wood treatment alone never counts as the pretreat (Rule 118.05(2)).
Can builders sign it before the crew shows up?
Pretreats run on the pour schedule. The builder’s superintendent calls the day before, and nobody from the office is on the slab to hand over a contract.
Noma specializes in the Mississippi Termite Pretreatment Contract (MDAC Rule 115(6)). Upload your own contract once as a reusable document and send it for e-signature, or turn on “Send document when booked” so it goes out the moment the pretreat is booked. See how Noma sends contracts for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.