Monthly Report of Wood Destroying Insect Control Work Worksheet
A worksheet for gathering a month of Mississippi termite jobs before you type them into MDAC’s online Monthly Report of Wood Destroying Insect Control Work, due by the 20th.
At a glance
- Required by
- Rule 116
- Filed by
- WDI licensee
- Due
- The 20th, for last month
- Filed on
- MDAC’s online form
Completed example
Download PDFWhat is the monthly WDI report?
It’s the list of termite treatments every Mississippi wood destroying insect licensee sends MDAC’s Bureau of Plant Industry each month. Each job gets the owner or builder, the address, the date, codes for the treatment and the structure, the footage, the product, and the gallons. A termiticide inventory closes it out.
MDAC takes it through a web form now, and its old fillable template no longer loads. This worksheet is not the filing. It mirrors the web form’s fields and codes so you can gather the month on paper, then type it in.
When is it due?
By the 20th, for the month before. Rule 116 covers “structural pest treatments applied during the previous calendar month,” and it doesn’t skip slow months: “A report shall be filed each month even though no work is performed.”
Pretreats go on phase by phase, with the subdivision, lot, and city. Existing houses go on once the treatment is done. Bait systems go on when they’re installed, under Rule 115(14) in MDAC’s rule book.
How to fill it out
Pull every job from the month. Work from your technician work sheets, not memory. Each treatment is one row, up to 20 per online report. Inspections and re-exams stay off.
Use MDAC’s codes. PT for the horizontal barrier, P for the perimeter at final grade, S for a spot, EP/LI for a fipronil exterior perimeter job, B for bait. Structure codes include C for crawl and M for mono. The key is on page 1.
Put the footage in the right group. Pretreat square feet and vertical barrier feet go on the left, retreat and spot feet at 4 or 2 gallons per 10 feet in the middle, and the product, strength, and total gallons on the right. A pretreat record has the slab square footage you need.
Make the inventory add up. Start plus purchased, minus used, should equal what’s on the shelf. At 78 fl oz of Termidor SC per 100 gallons of 0.06%, 425.6 gallons used 332.0 fl oz of concentrate.
Where do you find last month’s jobs on the 19th?
The report is easy once you have the list. The hard part is building it from clipboards, texts from the crew, and a calendar on the office wall, the night before it’s due.
Noma specializes in the Monthly Report of Wood Destroying Insect Control Work (Rule 116). Every termite job is scheduled, invoiced, and paid in Noma, so last month’s jobs are already in one place. See how Noma runs termite jobs.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
WDO activity log templates- Alabama
Monthly Report of Subterranean Termite Work
Report termite inspections or jobs to the state. - ArkansasForm 906
Monthly Report of Jobs Performed for Termites and Other Structural Pests
Report termite inspections or jobs to the state. - California
WDO Activity Log
Report termite inspections or jobs to the state. - LouisianaAES-23-12, AES-23-17, AES-23-25
Monthly WDIE, WDIR, and Termite Perimeter Reports
Report termite inspections or jobs to the state. - Nevada
Termite Pretreatment Notification
Report termite inspections or jobs to the state.









