Termite Pretreatment Notification
In Nevada, you send the Department of Agriculture a Termite Pretreatment Notification, which NAC 555.427 calls the Termiticide Pretreatment Notification Form, before you pretreat a new home.
At a glance
- Required by
- NAC 555.427
- Filled out by
- The licensee doing the pretreat
- Due
- Before the first treatment
- Sent to
- NDA’s Las Vegas or Sparks office
Completed example
Download PDFWhat is this form?
It’s a heads-up to the Nevada Department of Agriculture that you’re about to pretreat new construction for termites. NDA uses it to know which subdivisions to check while the slabs are open.
Nevada sets the form itself. The rule names it the “Termiticide Pretreatment Notification Form,” and NDA’s PDF prints “Termite Pretreatment Notification.” This page is a fillable copy of NDA’s PDF, which stays the copy of record. NDA also takes it on its online form.
When is it due?
Before the first treatment. NAC 555.427(1) says it goes in “Before performing a preconstruction treatment.” One notice can cover a whole phase, since it lists the number of sites and an expected start and completion date.
Clark and Nye county jobs go to Las Vegas at pretreat@agri.nv.gov or fax (702) 668-4567. Everything else goes to Sparks at fax (775) 353-3713. Skip it and NAC 555.530(20) sets a $301 to $1,000 fine the first time, and $1,001 to $5,000 after that.
How to fill it out
Fill in the company block. The starred boxes are the ones the rule requires: the company name, the date you send it, and a phone number. Add a contact, your NDA business license number, and an email so NDA can reach someone who knows the job.
Pin down the site. Give the subdivision name, the lots or address with the ZIP code, and the nearest major cross streets. An inspector should be able to drive there from this box alone. Then name the builder you’re working for.
Give the dates and the count. Write when the first slab is due and when you expect the last final grade, then the number of sites. Check soil, wood, or both.
Say where the tags go. Check each place the green NDOA Pre-Treatment Tag will go, such as the plumbing stub-out for slabs and the electrical panel for final grade. Leave the NDOA Use Only boxes empty and send it.
Do you have to track every phase by hand?
A 40-lot phase can run from August to November. Each slab needs its treatment, its tag, and a line on the application record, and the builder wants an invoice that matches.
Noma specializes in the Nevada Termite Pretreatment Notification (NAC 555.427). Schedule each slab as a job, then invoice the builder and take payment online in the same place. See how Noma schedules termite jobs.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
WDO activity log templates- Alabama
Monthly Report of Subterranean Termite Work
Report termite inspections or jobs to the state. - ArkansasForm 906
Monthly Report of Jobs Performed for Termites and Other Structural Pests
Report termite inspections or jobs to the state. - California
WDO Activity Log
Report termite inspections or jobs to the state. - LouisianaAES-23-12, AES-23-17, AES-23-25
Monthly WDIE, WDIR, and Termite Perimeter Reports
Report termite inspections or jobs to the state. - Mississippi
Monthly Report of Wood Destroying Insect Control Work Worksheet
Report termite inspections or jobs to the state.









