Pre-Treatment Tag and Final Grade Tag Worksheet
Nevada pretreats need NDA’s green Pre-Treatment Tag at the slab and a final grade tag in the electrical box, and this crew worksheet holds every fact both tags and NDA’s e-tag ask for, but it isn’t a tag.
At a glance
- Required by
- NAC 555.428
- Filled out by
- The licensee who treats
- Tag goes on
- Slab plumbing or permit board
- Final grade due
- Within 30 days of grading
Completed example
Download PDFWhat is this worksheet?
Nevada pretreats run on NDA’s green Pre-Treatment Tag. You fill one out and fix it at the site after each slab treatment, then put another in the electrical box after the final grade. When that box can’t take a tag, NDA’s online e-tag stands in. This worksheet holds every fact those three ask for, so the crew writes it once.
It isn’t a tag, and it says so at the top. NAC 555.428 says each tag must be on a form NDA prescribes, and “A tag may not be duplicated.” Get the green tags from NDA Pest Control. Before any of this, the pretreatment notification goes to NDA.
When do you fill it out?
Right after each application. The tag goes up immediately, on the slab’s plumbing or other penetrations, on the permit board, or a spot NDA approves. Under NAC 555.530, not fixing it right away runs $301 to $1,000, and so does a false tag.
Within 30 days of final grading. NAC 555.427 wants a vertical barrier along the outside of the foundation or slab once grading and other soil work are done. That tag goes in the electrical box. If it can’t, file NDA’s electronic final grade tag instead.
How to fill it out
Start with the job box. Write the business, builder, subdivision, and lot, plus the day the pretreat notice went to NDA. Clark and Nye counties go to Las Vegas, and every other county goes to Sparks.
Copy the label, not your memory. The tag wants the brand and EPA Reg. No., like Termidor SC, 7969-210, the dilution as a percent of active ingredient, such as 0.06%, and the total gallons of diluted mix. Jot the square and linear feet too, so the gallons check out against the label rate.
Mark what you treated and how. Check soil, wood, or both, and for soil, vertical, horizontal, or both. Print the licensee’s full name, then note where the green tag went.
Close out the final grade. Write the day grading ended and the date 30 days out, then the same product facts. If the tag didn’t go in the box, pick NDA’s reason and log when you sent the e-tag. File a copy of the HUD-NPMA-99-B with your 2-year treatment record, as NAC 555.410 requires.
How do you track final grades across a subdivision?
A 40-lot subdivision means 40 slab visits and 40 final grades, and the builder sets every grading date. Miss one 30-day window and the fine lands on your license, not theirs.
Noma specializes in the Nevada Pre-Treatment Tag and Final Grade Tag Worksheet (NAC 555.428). Schedule each slab and final grade as a job, then invoice the builder and take payment online. See how Noma schedules and bills termite work.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
New construction treatment record templates- Arizona
Pretreatment Tag and Final Grade Record
The treatment record for a new home’s termite pretreatment. - Colorado
Colorado pre-construction termite treatment record (Part 6.04(a))
The treatment record for a new home’s termite pretreatment. - Georgia
Pre-Construction Soil Treatment Graph
The treatment record for a new home’s termite pretreatment. - Hawaii
Pre-Construction Termite Treatment Record
The treatment record for a new home’s termite pretreatment. - Louisiana
Pretreat Log and LDAF Notice Record
The treatment record for a new home’s termite pretreatment. - Mississippi
Termite Pretreat Plot and Meter Box Sign
The treatment record for a new home’s termite pretreatment. - OklahomaHUD-NPMA-99-B
New Construction Subterranean Termite Service Record
The treatment record for a new home’s termite pretreatment. - Tennessee
Tennessee new construction termite pretreatment record
The treatment record for a new home’s termite pretreatment. - Virginia
Virginia new construction termite treatment record
The treatment record for a new home’s termite pretreatment.













