New Construction Subterranean Termite Service Record

Oklahoma requires form HUD-NPMA-99-B, the federal New Construction Subterranean Termite Service Record, on every termite pretreat, attached to the builder’s contract along with a stub-out tag on the house.

At a glance

Required by
OAC 35:30-17-73(g)
Filled out by
The licensed pest company
Goes to
The builder, with the contract
Due
On every pretreat

Completed example

Download PDF
What is the HUD-NPMA-99-B?
It’s HUD’s one-page record of a termite pretreat on a new home. The pest company fills it out and sends it to the builder, and lenders and buyers use it later as proof the slab was treated. The builder’s own guarantee is a different form, HUD-NPMA-99-A.
HUD only asks for it when a builder, lender, FHA, or VA wants the treatment. Oklahoma goes further. OAC 35:30-17-73(g) says every pretreat applicator “shall issue Form NPCA-99b to the builder as an attachment to the contract.” NPCA-99b is the old name. Page 1 here follows HUD’s PDF, which stays the copy of record.
When is it due?
The tag goes on first. Right after the main slab is treated, a stencil, sticker, or tag goes on a stub-out that will stay easy to reach. It names the company, the date, and the termiticide. The pretreat contract has to list the total square feet and linear feet treated.
The outside foundation waits for final grade. It’s due within 30 days of the notice that landscaping is done, or a year after construction ends, whichever comes first. The finished 99-B then goes to the builder with the contract.
How to fill it out
Fill in Sections 1 to 3. Use your ODAFF business license number for “Company Business License No.” A new lot may not have mail yet, so add the lot, block, and addition after the street address.
Check the EPA number against the label. Brand names stick around after a product changes hands. Talstar P Professional, for one, is now 101563-255 on Envu’s label, not the old FMC number. Give the dilution and the total gallons for both days.
Answer “Yes” only when the outside is done. “Treatment Completed on Exterior” is the outside foundation after final grade. Since Oklahoma requires a contract on every pretreat, “Service Agreement Available?” is yes. If part of the slab couldn’t be treated, the builder signs the exceptions form.
Use page 2 for the labels. It has the stub-out tag, the bait tag, and the two borate labels OAC 35:30-17-74 added on July 11, 2025, each with “Do not Remove.” It also tracks the landscaping notice and the outside foundation date.
How do you keep track of the second trip?
The slab is easy to remember. The outside foundation comes months later, after a landscaping notice that’s easy to miss, and the 99-B can’t be finished until it’s done.
Noma specializes in the New Construction Subterranean Termite Service Record (HUD-NPMA-99-B). Schedule the slab and the outside foundation as their own jobs, then send the builder an invoice and take payment online when each one is done. See how Noma schedules pest control jobs.