Pre-Construction Termite Treatment Record

Record the termite protection installed at a Hawaii building site and give the builder a copy for the job file.

At a glance

Building code
Hawaii IBC 2304.12.2.1
Chemical soil work
Hawaii-licensed pest control operator
Keep on file
At least 2 years

Completed example

Download PDF
What is a pre-construction treatment record?
It records the termite protection put in at a new job site. The Hawaii building code gives three choices for the wood-frame buildings it covers.
When do you fill it out?
Record the work when protection goes in. For a treatment below the slab, keep the record ready before that part of the site is covered.
How to fill it out
Start with the site, permit, tax map key, and builder. List the licensed people on the job. Record the method used and fill in the product and treated zones if they apply.
Sign and date the record. Give the builder a copy and keep one in the company’s job file.
Download the treatment record
Print the PDF for the site or type the job facts in Word. The filled PDF shows where the builder and applicator sign.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.