Pretreat Log and LDAF Notice Record

In Louisiana, the pretreat log is the record a termite company keeps of every slab or pier pretreat and the notice it gave LDAF at least an hour before, as LAC 7:XXV.141.E.4 requires.

At a glance

Required by
LAC 7:XXV.141.E.4 and §117.Q
Kept by
The termite company
Notice to LDAF
At least 1 hour before
Outside perimeter
Within 12 months

Completed example

Download PDF
What is a pretreat log?
It’s the running list a termite company keeps of every slab or pier pretreat on a new home. Each line shows where the job was, when the termiticide went down, how big each structure is, and when you told LDAF about it.
Louisiana wants a heads-up before every pretreat. LAC 7:XXV.141.E.4 says the notice goes in by online form or a call to the district office, and “All pest control operators shall keep a log of all pretreats including the information noted.” LDAF doesn’t print the log, so this one holds every item.
When do you fill it out?
At least an hour before you start. Send LDAF’s pre-treatment notification form or call the district office for the parish, then write the notice on the log. LDAF’s reporting page lists each district’s parishes and phone line.
Again when the house is done. §117.Q says to record the nature and date of the completion of new construction. You have 12 months from the first treatment to treat the outside perimeter, then list it on the monthly perimeter report.
How to fill it out
Write down the notice. Check online form or called in, name the district, and note the date, time, and who sent it. LDAF’s online form also asks if it’s an initial notice, a revision, or a cancellation, so the log does too.
Give LDAF a way to find it. New streets often aren’t on a map yet. Add the lot and subdivision as directions, plus the parish, and the builder’s name and your contract number.
Size each structure. The rule asks for the estimated square or linear footage of each structure and how many there are. A house and a detached garage are two structures, so list both.
Mark the poster box if you left. If the crew leaves before the slab is done, §141.E.3 calls for a department-approved poster saying the treatment isn’t complete. This log doesn’t print that poster, so get the approved one from LDAF.
How do you keep up with a builder’s schedule?
A builder can pour three slabs in a week and give you an hour’s warning on each. Every one needs a notice, a log line, a WDIE line, and a perimeter treatment before its 12 months run out.