Oklahoma Termite Treatment Exceptions and SPOT/PARTIAL Disclosure

In Oklahoma, any termite treatment that skips a minimum standard has to explain why in a contract the owner signs, and this addendum holds every one of those sign-offs.

At a glance

Required by
2 O.S. § 3-86(A)(11)
Filled out by
The termite company
Signed by
The owner, or the builder
Due
Before the treatment

Completed example

Download PDF
What is this addendum?
It’s the written sign-off Oklahoma requires whenever a termite treatment won’t meet every minimum standard. The owner signs your explanation, and it rides with the termite contract. Skipping it is a violation on its own under 2 O.S. § 3-86(A)(11).
ODAFF has no form for it, so this is our own layout: one section for each rule that calls for a written sign-off. Check the ones that apply and leave the rest blank. The rules’ own sentences print word for word, and nothing on it claims ODAFF approval.
When do you need one?
Before the treatment starts. Each exception belongs in the contract, and a bait deviation has to be signed before the stations go in. The rules are in ODAFF’s rules manual, with spot jobs and exceptions under 35:30-17-69.2.
Two standards never come off the table. Soil treatment under the building (35:30-17-66) and slab treatment (35:30-17-69) “shall in no case be written out of the contract.” A pretreat area left untreated is its own case: the builder signs, under 35:30-17-73(f).
How to fill it out
Tie it to the contract. Use the same date as the termite contract, then fill in your ODAFF license number, the certified applicator, the owner, and the address.
Spell out the spot. Section B prints “This is a SPOT/PARTIAL treatment” for you. Name the exact location and the distances, at least 3 feet in 2 or more directions, and never the whole house.
Explain one-sided walls and bait gaps. If a tub or cabinets keep you off the activity side of a slab wall, say what’s in the way in section C. For bait stations that can’t follow the label or the 20-foot maximum, list every area left out and what you did instead.
Get the right signature. The owner signs for sections A to D, and the builder signs for a pretreat in section E. Give the owner a copy, and file yours with the contract and the termite treatment record.
Can the owner sign it before you drill?
A spot job is often a same-week call, and the addendum has to be signed before the work. Waiting on a scanned page keeps the crew in the truck.
Noma specializes in the Oklahoma Termite Treatment Exceptions and SPOT/PARTIAL Disclosure (OAC 35:30-17-69.2). Upload your contract and this addendum once, and Noma sends them for e-signature the moment the job is booked. Schedule, invoice, and collect payment in the same place. See how Noma sends contracts for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.