Official State of Alabama Waiver Form
Alabama’s Official Waiver Form is the two-part state form a termite company fills out when part of a subterranean termite treatment can’t meet the state minimums, signed by the owner before the treatment.
At a glance
- Required by
- Ala. Admin. Code r. 80-10-9-.16(4)
- Filled out by
- Termite company, signed by owner
- Signed
- Before the treatment
- Goes with
- The termite contract
Completed example
Download PDFWhat is the Official Waiver Form?
It’s Alabama’s two-part state form for the spots on a subterranean termite job that can’t meet the minimum requirements in Rule 80-10-9-.20. Part A lists seven soil barrier items and five bait or device items, each marked Yes, No, or N/A, with the owner’s initials beside every No. Part B holds the five conditions, a graph, and the signatures again.
Rule 80-10-9-.16(4) says your form must hold all of the information and be “equivalent to the format” of Exhibit B, effective Sept. 21, 2009. Ours follows Exhibit B word for word, in the same order. ADAI’s own 2012 fillable PDF is the copy of record.
When is it signed?
Before the treatment, any time a minimum can’t be met. Rule 80-10-9-.16(4) says the owner or agent signs it prior to treatment and gets a signed copy, and it becomes part of the termite contract. Bait jobs still owe every minimum except (6), (7), and (8). Defined treatments owe all but (6) and (8).
It follows the house. A later owner gets a copy before any termite contract or guarantee transfers, which is why the form has a line for a new owner during a sale, and why the buyer reading your termite letter should ask for it. Keep it with the contract, which you hold for one year past its end under Rule 80-10-9-.16(2).
How to fill it out
Fill in every section. Check comprehensive or defined for a soil job, or write the bait or device in the second section, and mark the other section N/A. Condition 5 says a blank section can make the waiver void.
Mark each item, and initial only the Nos. The seven soil items track Rule 80-10-9-.20: access, sanitation, clearance of 8 inches under girders and 12 under joists, wood to ground, tunnels, voids, and dirt-filled areas. The owner initials each No and nothing else.
Explain in detail. Say where, what you did instead, and why the rest can’t be done. “Porch tile set in mortar would crack, rods reach only 4 feet, so the fill along the middle 16 feet of the wall wasn’t treated” works. The form says “Owner did not want work performed” doesn’t.
Graph it, then sign both parts. Mark the spot with the item number and construction keys. Exhibit B has two slips we kept as printed: condition 2 says “grafting” where it means graphing, since the graph can’t replace the contract’s foundation diagram, and the keys list “Access Openings” for item 7, which is dirt-filled areas. ADAI’s 2012 file prints that key as “Treatment of Dirt-Filled Areas (7).”
Can owners sign the waiver before the crew arrives?
They should. The rule says the owner signs before treatment, but a paper waiver often gets signed on the tailgate the morning of the job, or turns up unsigned in the truck after the crew leaves.
Noma specializes in the Official State of Alabama Waiver Form (Exhibit B to Ala. Admin. Code r. 80-10-9-.16). Upload the waiver once as a reusable document, and Noma sends it for e-signature the moment the treatment is booked, so the owner signs before the crew arrives. See how Noma sends waivers for signature.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
Treatment waiver templates- Arizona
Refusal of Termite Re-treatment
Owners sign off on termite work that won’t be done. - Arkansas
Request for Exclusion of Certain Minimum Requirements for Structural Pest Work
Owners sign off on termite work that won’t be done. - Georgia
Official Waiver of the Georgia Minimum Treatment Standards for the Control of Subterranean Termites
Owners sign off on termite work that won’t be done. - Indiana
Indiana termite control customer disclosure
Owners sign off on termite work that won’t be done. - Louisiana
Waiver of Requirements of Minimum Specifications for Termite Control Work
Owners sign off on termite work that won’t be done. - Mississippi
Written Request for Spot Treatment
Owners sign off on termite work that won’t be done. - New Jersey
New Jersey consumer information waiver (N.J.A.C. 7:30-9.12(b)3)
Owners sign off on termite work that won’t be done. - North CarolinaForm No. 5
North Carolina Official Waiver of Minimum Requirements
Owners sign off on termite work that won’t be done. - Oklahoma
Oklahoma Termite Treatment Exceptions and SPOT/PARTIAL Disclosure
Owners sign off on termite work that won’t be done. - South Carolina
Official Waiver of Minimum Treatment Standards
Owners sign off on termite work that won’t be done. - Tennessee
Tennessee less than complete termite treatment acceptance
Owners sign off on termite work that won’t be done.















