Waiver of Requirements of Minimum Specifications for Termite Control Work

In Louisiana, the waiver of minimum specifications is what the owner signs under LAC 7:XXV.141.H when part of a structure can’t be treated to the state’s termite specs, with a diagram, a description, and a reason for each area.

At a glance

Required by
LAC 7:XXV.141.H
Filled out by
The pest control operator
Signed by
Property owner or agent
Due
Before or during treatment

Completed example

Download PDF
What is this waiver?
It’s the owner’s written OK to skip part of the state’s termite specs when an area can’t be treated the way §141 says. Think a patio poured against the slab, a finished floor over a bath trap, or a well too close to trench. You ask for it, and the owner or their agent signs.
Louisiana has no state form, but §141.H of the LAC 7:XXV (LDAF, March 2026) names three things it must include: an inspection diagram showing the structure and each waived area, a description of each area, and the reason for each. This form prints all three in the rule’s own words.
When is it signed?
Before or during treatment. That’s §141.H.1, and the owner gets a signed copy. Spot treatments and combination liquid spot and bait jobs need it before you start (§141.F.1 and J.6). The trench and treat basics in §141.B.1-3 “shall not be waived.”
Then there’s the monthly report. §141.F.1 still says a copy goes in with it, but LDAF’s 2026 AES-23-12 WDIE report says “Copies of waivers should not be submitted with monthly reports” and only asks Yes or No. Mark “Yes” on the monthly report and check with LDAF before you mail a copy.
How to fill it out
Tie it to the job. Fill in the owner, the structure’s address, your POB permit, the contract number, and the inspection date. Check whether it’s a first treatment, a retreatment, a spot job, or a combination spot and bait job.
Draw the structure and number each area. Sketch the outline, dash the parts you won’t treat, and write a number on each one. The same diagram goes on the termite contract, so keep the numbers the same.
Describe each area and give the reason. Be specific: “24 feet of brick patio against the rear slab” beats “patio.” Name the §141 spec you’re skipping, such as D.1.d for drilling an abutting slab, so an LDAF inspector can see what was left out.
Sign, then leave a copy. Check whether the owner signed before or during treatment, and both sides sign. Write down when the copy went to the owner and who gave it. Keep the original three years after the contract expires (§117.H).
Can the owner sign it before you get there?
On a spot job, no signature means no treatment. If the owner works days or lives out of town, the crew waits or the job gets pushed. Most of the waiver is known after the inspection, so it can go out early.
Noma specializes in the Waiver of Requirements of Minimum Specifications for Termite Control Work (LAC 7:XXV.141.H). Upload your waiver once as a reusable document and send it for e-signature, so the owner signs online before the crew arrives. See how Noma sends documents for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.