Request for Exclusion of Certain Minimum Requirements for Structural Pest Work

In Arkansas, the Request for Exclusion of Certain Minimum Requirements for Structural Pest Work is the Department of Agriculture’s form for leaving a minimum treating standard out of a termite contract, and 2 CAR § 54-303 makes it the only way to do that.

At a glance

Required by
2 CAR § 54-303
Filed by
The termite company
Decided
Within 2 working days
Fee
$50 per request

Completed example

Download PDF
What is the exclusion request?
It’s Arkansas’s version of a treatment waiver, but it works backward from most states. You don’t just get the owner to sign off. You ask the Department of Agriculture first, check the one standard you can’t meet on part of the building, and the Department approves or denies it.
2 CAR § 54-303 says exclusions are made on forms the Department supplies, and any other paper used to write a substandard termite contract is strictly prohibited. So file on the Department’s own PDF, the copy of record. Ours copies it word for word, but it’s only a reading and drafting copy of the request. The approved form the Department sends back is what counts.
When do you need one?
Before you treat, any time a standard can’t be met. The rule allows it only when unusual structural or physical conditions make a fix impractical on part of the building. The rest of the building still has to meet every other standard. Each request costs $50, and the Department decides within two working days of getting it.
There’s a ceiling. Approvals in a license year (July 1 to June 30) are capped at 20% of the buildings you reported and paid fees on the year before. The Pest Control Program strongly encourages sending requests electronically, and the form prints the email address to use.
How to fill it out
Fill in every line. Six for the owner and six for your company, down to the cell numbers and email addresses. A request missing any of them is incomplete and may not be processed. Give a number the owner will answer, because staff may call them before deciding.
Check only what you can’t do. Each of the 13 items is worded as work that won’t be done, so a check means left out. In our Pine Bluff example, the joists under one back room sit about 6 inches off the soil, so item 3, proper clearance, is the only box checked.
Make sure the owner agrees. If staff find the owner isn’t fully informed and in agreement with the work, the request is denied. Walk them through it before you send it, not after.
Sign the approved form and attach it. You sign it, get the owner’s signature and date, and it becomes part of the termite contract. The contract has to say the minimum requirements weren’t met and reference the form, or the approval is void and a pink slip follows. The exclusion number goes on Form 906, and the next letter of clearance has to tell the new owner, per 2 CAR § 54-304(c).
Can the owner sign the approved form remotely?
The Department answers in two working days, then the job waits on the owner’s signature. If the owner works days or lives out of town, that’s another drive to Pine Bluff before your crew can treat.
Noma specializes in the Request for Exclusion of Certain Minimum Requirements for Structural Pest Work (2 CAR § 54-303). Upload the approved form as a PDF and send it to the owner for e-signature, so it’s signed before your crew shows up. See how Noma sends forms for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.