Subterranean Termite Contract

Alabama’s subterranean termite contract, the “termite bond,” is the written contract an owner signs before any termite work, with the boxed statement Rule 80-10-9-.16 requires at the top of page 1.

At a glance

Required by
Ala. Admin. Code r. 80-10-9-.16
Filled out by
The permittee
Signed by
Owner or authorized agent
Due
Before any work begins

Completed example

Download PDF
What is an Alabama termite bond?
It’s the written subterranean termite contract Ala. Admin. Code r. 80-10-9-.16 requires on every termite job. Owners and real estate agents call it the termite bond. It sets the treatment, the price, the yearly inspection, and the renewal fee.
ADAI doesn’t print a contract, but the rule sets one boxed statement you copy word for word. Don’t mix it up with ADAI’s Bond to Perform Subterranean Termite Eradication and Control Work. That’s a $2,500 surety bond your company files with the Commissioner, payable to the state. It isn’t the homeowner’s bond.
When do you need one?
Before any work begins. Rule 80-10-9-.16(1) says the permittee executes a written contract with the owner or the owner’s agent first. It has to cover at least one year, and you keep a duplicate for one year past its end. Bait jobs and spot treatments get one too.
If part of the house can’t meet the r. 80-10-9-.20 minimums, the owner signs the Official Waiver before treatment, and it joins the contract. A spot treatment is only allowed on a house already under contract with you.
How to fill it out
Pick the boxed statement first. Statement 1 covers retreatment only. Statement 2 adds repair of termite damage within the limits you write in. Print exactly one at the top of page 1, in bold letters at least 1/8 inch tall inside a heavy black line. A label-allowed defined treatment adds “Defined Post Construction Soil Treatment” inside the box.
Draw the foundation and mark the tubes. On an existing house the diagram has to disclose any visible evidence of active or previous infestation. Bait jobs also show every station and name the bait product, with checks at least every 90 days unless the label says otherwise.
Get wood contacts in writing. If the owner won’t agree in writing to remove wood touching the soil, r. .20(4) says you treat the wood and the soil at that spot. The form has a line for their choice and initials.
Spell out the money and the visits. Write the total price, the reinspection interval, the renewal fee, and how many years it stays fixed. Each yearly visit gets its own annual inspection report, and r. 80-10-9-.21 bans routine yearly retreatment unless one of its five conditions applies.
Can owners sign it before the crew shows up?
No work starts until the owner signs, and the Official Waiver has to be signed before treatment too. On paper, that means a second trip to the house or a crew waiting in the driveway.
Noma specializes in the Subterranean Termite Contract (Ala. Admin. Code r. 80-10-9-.16). Upload your own contract once, and turn on “Send document when booked” so the owner gets it to e-sign the moment the job is booked. See how Noma sends contracts for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.