Annual Termite Re-examination Report

In Mississippi, a termite company re-examines every contracted home before the contract expires and every year after, then files a written report with the owner, under MDAC Rule 115(7).

At a glance

Required by
MDAC Rule 115(7) to (13)
Filled out by
The termite licensee or inspector
Due
Before the contract expires, then yearly
Kept
A copy in the operator’s file

Completed example

Download PDF
What is an annual termite re-examination report?
It’s the written report you leave after the yearly check on a termite contract. It says whether termites or beetles are present or absent, and a copy goes in your file. Pages 2 and 3 are the letters for a check you couldn’t make and a contract you won’t renew.
MDAC prints no form, but Rule 115 sets what goes in it. Those rules are for termite work only. Rule 115 opens, “Section 115-120 applicable to wood destroying insect licenses and permits, only,” so a general pest agreement doesn’t need any of this.
When is it due?
Before the contract expires, then every year. Rule 115(7) says “Before the expiration date of said contract and annually thereafter.” Rule 115(8) adds that each one must include an exterior inspection and an interior inspection of the structure.
The letters run on their own clocks. If the owner won’t answer or let you in, make reasonable efforts, then tell them in writing the inspection wasn’t performed. If you won’t renew, the owner must hear in writing at least 30 days before the contract expires. Keep a copy of both.
How to fill it out
Check both sides of the structure. Mark the exterior and interior boxes, then present or absent for termites and for beetles. That’s the “condition of the property” Rule 115(7) wants on paper.
Write down what you saw. List what you found and where, the conditions that invite termites, and the areas you couldn’t reach, with the reason. A buyer’s inspector may read this report years from now.
Document before you retreat. Rule 115(12) bans annual re-treatment “unless there is clear documented site evidence that re-infestation and/or treatment zone disruption has occurred.” Fill in the evidence box first, with photos, then the retreatment box.
File it with the owner. Note the date and how it went out, check the copy kept box, and sign. For a missed check, list every try on page 2. For a contract you’re dropping, mail page 3 more than 30 days out.
How do you keep up with every anniversary?
A book of a few hundred termite contracts means a re-exam due nearly every workday, each before its own expiration date. Miss one and the owner can say the contract lapsed on your watch.
Noma specializes in the Annual Termite Re-examination Report (MDAC Rule 115(7)). Book each re-exam as a job on the schedule, then invoice the renewal and take payment online. See how Noma schedules termite renewals.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.