Kansas termite treatment diagram and service worksheet

Kansas termite statements call for a diagram of the structure. Use this sheet to tie the areas treated and the station locations to that drawing.

At a glance

Rules
K.A.R. 4-13-4a(e) and 4-13-7
Attach
Representative structure diagram
Partial work
State the type and show the area on the diagram

Completed example

Download PDF
Draw the structure before labeling the work
Put each foundation type on the drawing: basement, crawlspace, slab floor, and slabs against the foundation. This gives the client a way to see where service took place and where it did not.
Put the treatment type on the statement
For work that is not a complete treatment, K.A.R. 4-13-4a, contract and service statement details calls for a clear description such as “BAITING SYSTEM” or “LIMITED TREATMENT” and the treated areas on the diagram. Explain any urgent circumstances that caused the limited treatment, when applicable.
Use station IDs to join the records
For a bait plan, list placement and inspection dates and tie each station to the drawing. Keep the inspection dates or interval and the conditions for switching from monitors to bait on the contract or statement.
In Noma
Noma specializes in Kansas termite treatment diagram and service worksheet. See how Noma handles termite and pest paperwork.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.