Specific WDO Inspection Report and Treatment Proposal

In Washington, every WDO treatment estimate has to come with a specific WDO inspection report, so this one form carries both: the report, its diagram, and the proposal the owner signs.

At a glance

Required by
WAC 16-228-2050 and -2060
Filled out by
PCO-Structural or SPI licensee
Signed by
Inspector and property owner
Kept
1 year by the company

Completed example

Download PDF
What is the specific report and treatment proposal?
It’s what you hand the owner when you bid WDO work in Washington. WAC 16-228-2060 won’t let a proposal or estimate go out alone. It travels with a specific WDO inspection report that says what you found, where, and why you’re proposing the work.
The state prints neither part, and no rule sets what the proposal itself says. So this form puts both on three pages: the report and its diagram, then the method, products, price, and warranty. It’s the usual next step after a Complete WDO Inspection Report finds ants, termites, or rot.
When do you write it?
Before you give a price. WAC 16-228-2050 ties a specific inspection to any proposal or estimate to prevent or control WDOs. Work under an existing warranty is the only pass. WSDA’s licensing page says a PCO-Structural license covers it, with no ICN.
Keep it out of the closing file. A specific report can’t replace a complete one in a sale, exchange, or refinance, and it has to say so in bold or bigger print. WSDA’s guidance says that clear marking is what lets you skip the ICN on a house that’s for sale.
How to fill it out
Fill page 1 the way the rule lists it. The owner or representative who asked, the date, the full address with any building or unit, and your name and WSDA license number. The not-for-real-estate box is already printed in bold.
Use the proper names. Check each WDO by its name from WAC 16-228-2005 and say what the evidence was and where. For moisture ants, dampwood termites, beetles, or rot, list the conducive conditions. The removal sentence the rule asks for is printed right under them.
Send the diagram with it. Page 2 is the diagram, and 2060(7) says it goes with the report, not into a drawer. Mark the WDOs and the work, then fill in the method, each product’s EPA Reg. No. off the label, and the work in plain words.
Get the owner’s signature. Found nothing, and the work is preventative? Check the box on page 1 and have the owner sign under it, as 2050(3) requires. Then they accept the price on page 3, and you keep the report on file for a year.
Can owners sign it before the crew shows up?
Dampwood jobs start in a crawl space and end with a carpenter. Owners want time to read a bid that size, and a paper copy left on the counter stalls the schedule while the wood keeps getting wetter.
Noma specializes in the Specific WDO Inspection Report and Treatment Proposal (WAC 16-228-2060). Upload your own version once as a reusable contract and send it to each owner for e-signature, or turn on “Send document when booked” so it goes out the moment the job is booked. See how Noma sends proposals for signature.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.

Other states