Structural Fumigation Report and Log

Texas’s structural fumigation report and log is the record a fumigation company keeps for each job, from the TDA notice to the final clearance readings.

At a glance

Required by
4 TAC §7.178(l)
Filled out by
Certified applicator
Covers
14 rule items and the label’s log
Kept for
At least 2 years

Completed example

Download PDF
What is this log?
It’s the company’s record of one fumigation, filled in as the job moves along. Texas calls it a report and lists 14 things it must hold. The certified applicator in charge has to have a copy on site.
Sulfuryl fluoride labels like Vikane’s add a site log of their own, with dosing facts, signatures, and clearance details. This log puts both lists on two pages. The signs posted on the same job are on the fumigation warning sign page.
When do you fill it out?
As the fumigation progresses, in the rule’s own words. Under 4 TAC §7.178(l), each item goes in as it happens, and the company keeps the report at least two years. The label’s (B) items, like structure type and volume, go in before the job starts.
The first entry is the TDA notice. It goes through TDA’s online notification system between 6:00 a.m. and 9:00 p.m., 4 to 24 hours before the crew is due. The log needs proof of it, with the date and time.
How to fill it out
Fill in page 1 before the release. The site, owner, structure, pest, and cubic feet go in first. Add the dosing facts from your Fumiguide run, then the TDA notice and the call to the fire department or police.
Check off the safety steps. Each box ties to the rule or the label, like the fact sheet, the vacancy check, secondary locks, and two SCBAs on site. Name the guard who watches the site when no applicator is there, and any extra steps you took.
Sign each step on page 2. Record the fumigant, pounds, cylinders, and chloropicrin. Then the certified applicator signs the release, aeration, final clearance, and release for occupancy, with who helped.
Write down every clearance reading. List the device, its serial number, and its last calibration, then a reading of 1 ppm or less for each room. Check where the sticker went, and call the same agency back when the house is released.
Can the owner sign before you arrive?
Page 1 of this log fills up fast on release day, with the crew waiting on the tarp. The last thing you need then is an owner who still hasn’t signed the contract.
Noma specializes in the Structural Fumigation Report and Log (4 TAC §7.178(l)). Upload your fumigation contract once, and the “Send document when booked” switch sends it for e-signature the moment the job is booked. Schedule, invoice, and get paid for the job in the same place. See how Noma runs fumigation jobs.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.

Other states