Official Waiver of the Georgia Minimum Treatment Standards
Georgia’s Official Waiver is the state-format form a termite company fills out when a subterranean termite treatment can’t meet the minimum standards, signed by the owner and attached to any termite letter for the house.
At a glance
- Required by
- Rule 620-6-.07(1)
- Filled out by
- Termite company, signed by owner
- Attach
- A graph of the untreated areas
- Kept
- Contract term plus 2 years
Completed example
Download PDFWhat is the Official Waiver?
It’s Georgia’s state-format form for the spots where a subterranean termite treatment can’t meet the minimum standards. You check each standard that wasn’t met, explain why, and attach a graph of the untreated areas. The owner, or an agent like a builder, signs it.
It isn’t a way around the rules. The Department’s fact sheet SPCS 14-09 says it’s only for spots where a standard isn’t possible or practical. Ours follows the Revised 2026 edition, but the Department’s own form, Reference A in that fact sheet, is the copy of record.
When is it signed?
When you issue the termite contract. The fact sheet says it goes out with the termite contract, or later if the structure changes. Rule 620-6-.07(1) in the Commission’s rules sets its format. When the Department inspects your job, any shortfall a waiver doesn’t cover goes on a corrective action report.
It also rides along with the termite letter. If your company issued a waiver for the house, the letter asks about it and a copy has to be attached. Keep it with the contract for the contract term plus two years, per Rule 620-6-.02(6).
How to fill it out
Use one form per structure. Fill in the company, the inspector with a certification or registration number, the owner, and the address. The form says one copy covering several buildings isn’t acceptable.
Check what wasn’t met. Pick the soil treatment type, then check each numbered item that falls short. On defined and pre-construction soil treatments, only items 1 to 3 apply. On a warranty-only contract, write “Warranty Only Contract” as the date job completed.
Explain where and why. Each “no” needs the area and the reason it can’t be done. “Front porch fill not drilled, slate set in mortar, owners declined” works. A missing reason can void the whole waiver.
Attach the graph, then sign. Draw the untreated areas on page 2, since a missing graph voids the waiver too. The owner signs and dates it, then gets a copy of both pages at signing or at the service.
Do owners have to sign it on paper?
No, and paper is where waivers get lost. The owner signs the contract at the kitchen table, the waiver stays in the truck, and an inspector later finds an untreated porch with nothing signed on file.
Noma specializes in the Official Waiver of the Georgia Minimum Treatment Standards for the Control of Subterranean Termites (Rule 620-6-.07). Upload the waiver once as a reusable document, then send it for e-signature with your termite contract, so the owner signs both before the crew arrives. See how Noma sends waivers for signature.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
- Arizona
Refusal of Termite Re-treatment
Owners sign off on termite work they turn down. - North CarolinaForm No. 5
North Carolina Official Waiver of Minimum Requirements
Owners sign off on termite work they turn down. - South Carolina
Official Waiver of Minimum Treatment Standards
Owners sign off on termite work they turn down.



