Official Waiver of Minimum Treatment Standards
In South Carolina, the Official Waiver of Minimum Treatment Standards is DPR’s form an owner signs before a termite treatment that will skip one of the nine minimum standards, as Reg. 27-1085(C) requires.
At a glance
- Required by
- Reg. 27-1085(C)
- Signed by
- Owner or their agent
- Due
- Before the work begins
- Kept
- 5 years, or the warranty’s length
Completed example
Download PDFWhat is the Official Waiver?
It’s DPR’s one-page form for a termite treatment that won’t meet all of South Carolina’s minimum standards. You mark each standard you won’t do and say why. The owner signs it before any work starts.
You can’t swap in your own version. S.C. Code Regs. 27-1085(C)(1) says the waiver must be the most recent one DPR publishes, and that’s still the Jan. 2006 sheet in DPR’s Clemson Box forms folder. DPR’s own PDF is the copy of record. The one thing it invites you to add is your logo, in the box at the top.
When do you need one?
Before work starts, any time a standard won’t get done. Every treatment has to cover the whole structure and meet the standards, unless the building or the owner makes that unnecessarily difficult or costly. Standards 1 to 3 (debris, wood touching soil, and shelter tubes) apply to every first treatment, whatever method you use.
Retreatments and boosters under an existing contract don’t need one. When you later write the CL-100 for a sale on a house you treated, check box 2 and attach a signed copy of the waiver. Keep yours five years, or as long as the warranty lasts, per DPR’s rules.
How to fill it out
Fill in the top first. Company, applicator, date treated, business license number, and the owner with the treatment address. One waiver can cover several buildings only when they share an owner and the same standards are waived. Name each building on it.
Mark only what you won’t do. Put an X on the blank in front of each standard you’re skipping. The form says the checked standards “will not be completed,” so a mark means skipped, not done.
Write the real reason. Check construction features, the owner’s choice, or other. Then say where and how much, like “front porch slab, about 16 ft along the front foundation.” The rule says a waiver can’t be a way to sell a job with less labor or less termiticide.
Get the signature first. The owner or their agent signs and dates it before you start. Give them a signed copy, keep the original, and file it with the termite contract.
Can owners sign it before you arrive?
The rule wants the signature before work begins. On a sale, the sellers may have moved out already, and your crew can’t start until someone signs.
Noma specializes in the Official Waiver of Minimum Treatment Standards (Reg. 27-1085(C)). Upload the filled-in waiver as a PDF and send it for e-signature, so the owner signs before your crew shows up. See how Noma sends forms for signature.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
- Arizona
Refusal of Termite Re-treatment
Owners sign off on termite work they turn down. - Georgia
Official Waiver of the Georgia Minimum Treatment Standards for the Control of Subterranean Termites
Owners sign off on termite work they turn down. - North CarolinaForm No. 5
North Carolina Official Waiver of Minimum Requirements
Owners sign off on termite work they turn down.



