North Carolina Official Waiver of Minimum Requirements
North Carolina’s Form No. 5 is the state’s own sheet for writing down any minimum termite treatment step a job will skip, signed by the owner before the work starts.
At a glance
- Required by
- 02 NCAC 34 .0603
- Filled out by
- Licensee, signed by the owner
- Due
- Before any treatment starts
- Kept
- 2 years past the agreement
Completed example
Download PDFWhat is the official waiver?
North Carolina sets minimum steps for treating an existing home for subterranean termites, like opening up a crawl space, drilling masonry walls, and drilling slabs that block trenching. When a job will skip one, Form No. 5 is where you say which step, where, and why. The owner signs it with the termite proposal.
It’s a state form, not a company form. The Division’s Fall 2024 bulletin says you can’t change its words or put your letterhead on it. And it only waives the state’s minimums. Anything the termiticide label requires still has to be done.
When is it signed?
Before any work starts. Under 02 NCAC 34 .0603, each skipped step has to be fully explained in writing before the treatment. Once the owner signs, the waiver becomes part of the agreement. An incomplete waiver isn’t accepted.
Skip a step without one and the Division writes it up. A missing crawl space opening, an undrilled masonry wall, or an undrilled slab over fill dirt with no waiver is a primary deviation under 02 NCAC 34 .1102. You get 30 days to fix it, and every Division reinspection costs you a fee, starting at $25 (02 NCAC 34 .1103).
How to fill it out
Fill in the header. Write the owner, the agent if one signs, the property address if it’s different, and the date of the contract. Then check one construction box: basement, crawl space, slab, or combination.
Check only what you’ll skip. Each checked item from A to M is a step that won’t be done. Items A to E apply even to bait-only jobs, so debris you won’t pull out of a crawl space still means checking item B.
Say what, where, and why. Write the explanation on the lines next to the item. “Left side flagstone patio not drilled, 14 ft of foundation, owner declined” works. “Not done” is the kind of thin note inspectors flag.
Sign it, then treat. Check whether a service agreement covers the job, then you and the owner sign. Never hand over a blank one to sign later, and keep a copy for two years past the agreement (02 NCAC 34 .0604).
Do owners have to sign it on paper?
No, and paper is where most waivers go wrong. The owner signs the proposal at the kitchen table, the waiver gets left for later, and now it’s dated after the treatment.
Noma specializes in the North Carolina Official Waiver of Minimum Requirements (Form No. 5). Upload the state’s form once as a reusable document, then send it for e-signature right after your termite proposal, so both are signed before the first hole is drilled. See how Noma sends waivers for signature.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
- Arizona
Refusal of Termite Re-treatment
Owners sign off on termite work they turn down. - Georgia
Official Waiver of the Georgia Minimum Treatment Standards for the Control of Subterranean Termites
Owners sign off on termite work they turn down. - South Carolina
Official Waiver of Minimum Treatment Standards
Owners sign off on termite work they turn down.



