On-Site Sewage System Property Transfer Inspection Report

The septic inspection every Washington home sale needs from February 1, 2027, with every item the state rule lists.

At a glance

Required by
WAC 246-272A-0270(1)(k)
Filled out by
Inspector the county approves
Filed with
Local health jurisdiction
Due
Before closing, from Feb. 1, 2027

Completed example

Download PDF
What is a septic transfer inspection?
It’s a full check of a home’s septic system when the home sells. Starting February 1, 2027, WAC 246-272A-0270 makes every Washington seller with a septic system get one, from a third-party inspector the local health officer authorizes.
The state lists what it covers in WAC 246-272A-0260, but prints no form. Each county files the results on its own approved form, often online through OnlineRME. This report holds every item the rule lists, so it works as your field record and the client’s copy. The county’s form is still the one you file.
When is it due?
Before closing, statewide from February 1, 2027. Ten counties already require one: King, Pierce, Thurston, Kitsap, Island, Mason, Jefferson, Skagit, Clark, and Clallam. Each names it its own way. King says time of sale, Pierce and Clark say Report of System Status, Thurston says Time of Transfer, and Kitsap says Property Conveyance Inspection.
The health officer can skip the sale inspection when the system is current on its routine checks, and can set a repair schedule when it finds a failure. The seller also hands the buyer every maintenance record with the seller disclosure statement under RCW 64.06.020, the statute behind the Form 17 agents use.
How to fill it out
Fill in the facts and the system. Address, date, parcel, and your local approval number, which WAC 246-272A-0340 says you need before you inspect. Pull the permitted type and design flow from the county file. A house is sized at 120 gallons per bedroom per day at least, under WAC 246-272A-0230.
Open and measure every tank. One column per tank: baffles, effluent filter, water level, scum, sludge, solids, watertightness, structure, and the lids and risers. If you pumped it, write the gallons. A pump chamber gets its own column.
Walk the drainfield and reserve area. Look for surfacing, ponding in the ports, roof drains, and traffic. Then check the other parts, like the pump and alarm, and any proprietary product by its O&M manual. Write every deficiency on its own line in section 7.
Check the drawing, sign, and file. Mark the record drawing accurate, or sketch a site plan on page 3. Sign, file on the county’s form, and note the date and record number. The buyer’s home inspection report skips the septic system, so this is the only look it gets.
Do you have to write it up twice?
Often, yes. Measurements go on a clipboard at the riser, then get typed into the county’s online form that night, and the client wants their own copy too.
Noma specializes in the On-Site Sewage System Property Transfer Inspection Report (WAC 246-272A-0260). Noma’s property inspection reports let you set your own sections and titles, so yours can follow the rule item by item, and the summary always lists the problems you mark most serious. Booking, invoices, and online payment come with it. See how Noma handles inspection reports.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.

Other states