Fumigation Job Log
Hawaii’s fumigation job log is the record HRS 460J-22 says a licensee keeps for every fumigation job, built from the Vikane label’s log and the state’s two record rules.
At a glance
- Required by
- HRS 460J-22, Vikane label
- Filled out by
- Certified applicator in charge
- Due
- (B) items before the start
- Keep for
- 2 years
Completed example
Download PDFWhat is this log?
It’s the record of one fumigation job, from the dose math to the final clearance test. In Hawaii it’s also the law: HRS 460J-22 says a licensee “shall maintain a log of each fumigation job.”
The statute points to a Board form that doesn’t exist, so this log merges the label’s list with the state’s two record rules. The sign posted on the same job is on the fumigation warning sign page.
When do you fill it out?
Start it before the tarps go up. The Vikane label marks five items “(B)”: the company, site address, structure type, target pests, and volume. The rest goes in as the job runs.
Keep it at least two years, open to the Board during business hours. The Board’s job record and DAB’s restricted use record run two years too, so one log covers all three.
How to fill it out
Name who’s in charge. Under HRS 460J-21, the job runs under the direct supervision of an applicator DAB certified for structural fumigation. Write their name and DAB number, plus the site’s TMK.
Do the (B) items first. Fill in section 1 and the volume on the walk-through. Drywood termites take the label’s base dose, 1X. Formosan termites take 4X, so a tent for both pests doses for the Formosans.
Fill the (HI) boxes. The client, date, branch (BR-1), and method are the Board’s. The EPA number (1015-78 for Vikane), formulation, percent active ingredient, area, and entry interval are DAB’s, and they copy straight into Form P-45A at year end.
Check the aeration box. At 16 oz/MCF or less, the label allows Aeration Procedure 1 or 2. Over that, only Procedure 2. Test each room with a device on EPA’s list until it reads 1 ppm or less.
Do you have to dig these out every January?
Yes, if they live on clipboards. Every certified applicator files the yearly report on DAB’s RUP reporting page by January 30, and a missing log means a missing Vikane line.
Noma specializes in the Fumigation Job Log (HRS 460J-22). Upload your fumigation contract once, send it for e-signature on each job, and schedule and invoice the fumigation in the same place. See how Noma runs fumigation jobs.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
Other states
Fumigation log templates- Alabama
Alabama Structural Fumigation Log
Record the gas, the dose, and the clearance for each fumigation. - Arizona
Site-Specific Structural Fumigation Log
Record the gas, the dose, and the clearance for each fumigation. - Florida
Fumigation Log
Record the gas, the dose, and the clearance for each fumigation. - Louisiana
Fumigation Record and Gas Reading Log
Record the gas, the dose, and the clearance for each fumigation. - Maryland
Structural Fumigation Log
Record the gas, the dose, and the clearance for each fumigation. - Nevada
Structural Fumigation Record
Record the gas, the dose, and the clearance for each fumigation. - South Carolina
Site-Specific Structural Fumigation Log
Record the gas, the dose, and the clearance for each fumigation. - Texas
Structural Fumigation Report and Log
Record the gas, the dose, and the clearance for each fumigation. - Washington
Site-Specific Structural Fumigation Log
Record the gas, the dose, and the clearance for each fumigation.













