Alabama Structural Fumigation Log

The Alabama structural fumigation log is the record the Vikane label says to keep for every tent job, with a line for the operator’s Fumigation category permit and ADAI’s three-year keep.

At a glance

Required by
Fumigant label (r. 80-10-9-.14)
Filled out by
Certified operator in charge
Due
(B) items before the start
Kept for
3 years

Completed example

Download PDF
What is this log?
It’s the record of one structural fumigation, from the dose math to the final clearance test. Alabama doesn’t print one. The Vikane label lists what every log has to hold, and ADAI’s rules make the label binding.
This one adds two Alabama lines: the certified operator in charge with the permit that carries the Fumigation Pest Control category, and a note to keep it three years. The signs posted on the same job are on the fumigation warning sign page.
When do you fill it out?
Start it before the gas goes in. Under Ala. Admin. Code r. 80-10-9-.14, every pesticide is used “in a manner consistent with its label.” The Vikane label marks five items “(B)”: the company, site address, structure type, target pests, and volume. Those go down before the fumigation starts.
The rest goes in as the job runs. EPA’s site log page adds the number of fans and the nearest hospital. Then keep it three years, since r. 80-1-13-.14(2) covers every application by a commercial pesticide permit holder.
How to fill it out
Do the (B) items first. Fill in section 1 and the volume on the walk-through, before the tarps go up. On a powderpost beetle job, use the label’s 10X dosage factor. ADAI’s beetle rule, r. 80-10-9-.22(3), has you tell the owner about other treatments before you recommend fumigation.
Log the release. Write who put in the chloropicrin and gas, their permit number, and the second trained person. Then the ounces of chloropicrin, the cylinder serial numbers, the pounds, and the release time.
Fill the Alabama box. Name the certified operator in charge and the permit number that carries the Fumigation category. With the brand, EPA number, pounds, dose, site, and pests above it, the log also covers the 80-1-13-.14 application record.
Clear it room by room. A dose over 16 oz/MCF calls for aeration procedure 2, which waits at least 14 hours from the first opening. Then test each room’s breathing zone with a device on EPA’s clearance device list, and okay re-entry only at 1 ppm or less.
Where does it fit in the job?
A beetle job runs from the morning the tarps go up to a clearance test the next evening, and the log rides along on a clipboard the whole time. The clearance readings are usually the first thing to go missing.
Noma specializes in the Alabama Structural Fumigation Log (Vikane label, r. 80-1-13-.14). Upload your fumigation contract once, send it for e-signature on each job, and schedule and invoice the fumigation in the same place. See how Noma runs fumigation jobs.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.