Termite Contract Inspection Report

Florida’s termite contract inspection report is the signed report a pest control company leaves at every inspection or treatment under a WDO contract, showing whether covered pests are present, whether it treated, and with what.

At a glance

Required by
s. 482.226(3), F.S.; Rule 5E-14.105(6)
Filled out by
Licensee, signed for the owner
Due
At every contract inspection or treatment
Kept
At least 3 years

Completed example

Download PDF
What is a termite contract inspection report?
It’s the signed report you leave with the owner every time you inspect or treat under a Florida WDO contract. That covers the yearly renewal visit, a bait station check, and a re-treatment. It says three things: whether the covered pests are there, whether you treated, and what you used.
Florida doesn’t print a form for it. s. 482.226, F.S. says it “need not be on a form prescribed by the department,” so you build your own. How often you come back is set by the WDO treatment contract.
When is it due?
At every contract inspection or treatment. The owner or their agent gets the signed report, and Rule 5E-14.105, F.A.C.(6) has you keep a copy for at least 3 years. Find a covered pest on a visit the contract doesn’t call for, and (7) still wants a signed report.
The same rule runs the clocks. Inspect within 30 calendar days of the owner’s written notice, and re-treat within 90 days of finding the infestation, or 180 for commercial and multiunit buildings. If the contract expires first, you owe a written offer to re-treat within 90 days at no additional cost.
How to fill it out
Copy the contract’s terms. Fill in the owner, the contract date, the organisms, and the warranty. Note why you came, and if the owner sent written notice, the day it arrived so the 30-day clock is on paper.
Check present or absent. Then write the evidence and where it is, including termites in a bait station out in the yard. Add conducive conditions and every area you couldn’t inspect, with the reason.
Name the pesticide. If you treated, write the pesticide’s common or brand name, the EPA Reg. No., where it went, and how much. Rebaiting a station counts. Then sign it and hand the owner their copy.
Use page 2 when it applies. Found wood touching the soil or another condition your contract excludes? Give written notice within 60 days of finding it, with 60 days to fix it. The Consumer Notice Form tells owners you have to, so skipping it can sink a denial later.
Where does it fit in the yearly renewal?
Renewals are steady money, and missed follow-ups are expensive. Failing to re-treat or repair under three contracts in two years can suspend your new construction permit for 30 to 90 days under s. 482.0815, F.S..
Noma specializes in the Termite Contract Inspection Report (s. 482.226(3), F.S.). Put each contract visit on your schedule as a job, then send the renewal invoice so the owner can pay online. See how Noma schedules and bills each visit.
Frequentlyaskedquestions

Send this document in minutes, not an afternoon.

Other states