Pre-Construction Termite Treatment Disclosure
In Texas, the pre-construction termite treatment disclosure is the written disclosure, with TDA’s SPCS/D-4 builder’s guide, that a pest control company must give a builder before it pretreats a new home, under 4 TAC §7.174.
At a glance
- Required by
- 4 TAC §7.174
- Filled out by
- Termite licensee
- Goes to
- The builder or buyer of the pretreat
- Due
- Before the first application
Completed example
Download PDFWhat is the pretreatment disclosure?
It’s the written disclosure you give a builder before you pretreat a new home for subterranean termites. It goes out with the pesticide label, TDA’s consumer information sheet, and the full warranty, if you give one. A home that’s already built gets the termite treatment estimate instead.
What sets Texas apart is the guide. 4 TAC §7.174(b)(10) says the builder or buyer of the pretreat gets TDA’s “Proper Pre-Construction Subterranean Termite Treatments” guide before you start. That’s form SPCS/D-4, and it ends with a receipt line the builder signs. Our pages 3 and 4 copy it word for word, but TDA’s own D-4 PDF is the copy of record.
When is it due?
Before the first application. The disclosure and the guide both have to reach the builder before treatment starts. Only a licensed technician or certified applicator in the termite category can write it, and one of them signs to approve it.
A full treatment takes two trips under 4 TAC §7.173. The horizontal barrier goes down after grading and before the slab is poured. You come back after final grade for the vertical barrier, within 30 days of hearing the landscaping is done or 1 year after construction ends, whichever comes first. Any building other than a single family home also needs a notice to TDA 4 to 24 hours before each application.
How to fill it out
Draw the whole slab. The diagram needs the perimeter of the entire structure in feet, written as numbers. Include the garage, porch, and patio, and mark where the horizontal and vertical barriers go. Note any conducive conditions you can already see, like form boards or scrap wood.
Check the type the guide uses. The D-4 sorts pretreats into full, partial, wood, bait, and barrier. Full means a continuous horizontal and vertical barrier. Anything less is partial, and that includes physical barriers or devices at slab penetrations. A physical barrier also needs its measurements and a drawing of the install.
Write the product and the numbers. Attach the label and write the concentration, the gallons, and the square and linear feet you’ll treat. Unless the label says otherwise, the guide’s rates are 1 gallon per 10 square feet of fill and 4 gallons per 10 linear feet per foot of depth along walls, piers, and pipes. What you actually apply goes on your use record.
Hand over the packet and get two signatures. The builder gets the label, the consumer information sheet, the warranty details, and the guide, then signs the guide’s receipt. Your applicator signs to approve the disclosure. 4 TAC §7.145 puts your license number and the jurisdiction statement on the face. Keep a copy for 2 years.
How do you keep track of the final treatment?
The first trip is easy to remember, since the pour is waiting on you. The vertical barrier is where pretreats slip. It’s due within 30 days of a landscaping call that may never come, and a builder can have dozens of lots going at once.
Noma specializes in the Pre-Construction Termite Treatment Disclosure (4 TAC §7.174). Upload your disclosure and D-4 receipt once as a reusable contract, send it to the builder for e-signature before each pretreat, and book the slab visit and the final-grade visit as two jobs. See how Noma sends disclosures for signature.
Frequentlyaskedquestions