Notice of Fumigation

South Carolina’s notice of fumigation is the written notice the state fire code requires for every tent job: one to the occupants, and one to the fire code official and fire chief at least 48 hours ahead.

At a glance

Required by
Fire code 2603.3
Sent to
Occupants and fire officials
Due
48 hours ahead to fire officials
Official form
None from the state

Completed example

Download PDF
What is this notice?
It’s the two written notices one tent job needs before the tarps go up. Page 1 goes to every occupant of the building. Page 2 goes to the fire code official and the fire chief.
South Carolina’s pest rules don’t ask for either one. The state fire code does, and the Vikane label adds the Fact Sheet. The red sign you post on the same job is on the fumigation warning sign page.
When is it due?
Fire code section IFC 2603.3 wants the fire officials told in writing at least 48 hours before the building is closed. Their notice names the location, the occupancy, the fumigants, who’s responsible, and when the operation begins.
Occupants need theirs early enough to get out, covering the purpose, how long it lasts, and the hazards. The Vikane label adds the Fact Sheet for Vikane once the contract is signed. The 2021 code has applied statewide since January 1, 2023, and the 2024 code takes over January 1, 2027 with no South Carolina change to this chapter.
How to fill it out
Start with the occupants. Fill in the building, who lives there, and the units. In a duplex or townhouse, check the box: the label says every unit has to be empty, and each occupied unit gets its own copy.
Give real times. Set the move-out time at least an hour before the operation begins, since the signs will say so. Then the release, the exposure hours, and a cautious re-entry estimate.
Get the Fact Sheet signed for. Hand an adult occupant the maker’s Fact Sheet with page 1, and have them sign the receipt. Keep the signed copy with the job’s log.
Send page 2 early. Deliver it to the fire code official and the fire chief at least 48 hours before the tarps are sealed, and write down who took it. The state’s code list leaves permits to each city or county, so ask if you need one.
Can clients sign it before you arrive?
The occupant’s signature usually waits for a second trip, or gets chased on tent day while the crew stands around. A notice signed a week early takes that off the schedule.