WDO Activity Log
Within 10 business days of every termite inspection or finished job, California companies report the property’s address to the Structural Pest Control Board and pay $5.
At a glance
- Required by
- Bus. & Prof. Code § 8516
- Filled out by
- Registered pest control company
- Sent to
- Structural Pest Control Board
- Due
- Within 10 business days
Completed example
Download PDFWhat is this log?
Every termite inspection and every finished job in California gets reported to the state. Not the report itself, just the property address, the date, what you did, and the inspector’s license number.
What you did is a code from 1 to 7. Code 1 is an original inspection, 4 is a reinspection, 5 is a completion notice, and 6 is a corrected report or notice.
When is it due?
Within 10 business days of starting an inspection or completing the work. Most offices gather a week or two of jobs and file them together.
Each address costs $5, set by 16 CCR § 1997. The deadline is in § 8516 for inspections and § 8518 for finished work. Skipping it can mean a fine of up to $2,500.
How to file it
Gather the jobs. List every inspection you started and every completion notice you sent since your last filing.
Code each one. Give every line its activity code, its date, and the inspector’s license number.
Check the addresses. Write the street number, street, unit, city, and ZIP the same way the report does.
File and pay. Type each address into SPCB Connect or upload a text file, then pay the fees. Keep your records for three years.
Do you have to keep the list by hand?
Most offices keep a spreadsheet. It’s easy to miss a reinspection or a corrected report, and the 10-day clock keeps running.
Noma specializes in the WDO Activity Log (Bus. & Prof. Code § 8516). Each inspection and completion notice lands on the list as it happens, with its code and license. Noma prepares the upload file, and you file it in SPCB Connect. See how Noma prepares WDO activity logs.
Frequentlyaskedquestions
Send this document in minutes, not an afternoon.
