Uniform Mitigation Verification Inspection Form
The Uniform Mitigation Verification Inspection Form, OIR-B1-1802, is Florida’s wind mitigation form, the one every insurer uses to set a home’s wind discounts.
At a glance
- Required by
- Rule 69O-170.0155, F.A.C.
- Filled out by
- Qualified mitigation inspector
- Good for
- Up to 5 years
- Pages
- 6, on OIR-B1-1802 (Rev. 04/26)
Completed example
Download PDFWhat is the wind mitigation form?
It’s OIR-B1-1802, the form a Florida homeowner sends their insurer to get wind discounts for the roof, the roof-to-wall connections, and the window protection. Every insurer has to use it, and inspectors often fill it out on the same visit as a 4-point inspection.
Rev. 04/26 replaced the 2012 version for inspections on or after April 1, 2026. It adds a Region question based on ASCE 7-22 wind speeds, a roof slope question, spray foam and synthetic tile choices, and a level Z for damaged openings. OIR’s own PDF is the copy of record. Ours matches it page for page, but use theirs if anything ever differs.
When do you need one?
Whenever a homeowner wants wind credits. That’s usually at a purchase, a new policy, or a renewal. Rule 69O-170.0155, F.A.C. adopts the current form, and OIR says it’s good for up to five years if the house doesn’t change.
s. 627.711, F.S. lists who insurers must accept. A home inspector needs at least 3 hours of hurricane mitigation training approved by the Construction Industry Licensing Board and a proficiency exam. Building code inspectors, contractors, engineers, and architects qualify too.
You have to inspect in person. Only engineers and contractors can send a direct employee, and they answer for that work. Knowingly giving a false form is a first-degree misdemeanor. The form cites subsection (7) for that, but the statute now puts it in (8). DBPR also asks home inspectors for 2 hours of wind mitigation CE each renewal.
How to fill it out
Start with the permit records. Question 1 needs the original permit date, and question 4 wants a roof permit date or product approval number plus the year it went on. A house permitted before March 1, 2002 outside Miami-Dade and Broward is a D on question 1.
Look up the Region and measure the roof. Question 2 points to the ASCE Hazard Tool, so print the result for the address. Question 3 asks which side of 6:12 the main roof falls on. For a hip roof in question 7, other shapes can be up to 10% of the perimeter, so write down both lengths.
Go into the attic for 5, 6, and 8. Record the weakest deck nailing and the weakest roof-to-wall connection you find, not the best one. Check the minimum condition that matches clips or wraps. Without proof of a sealed roof deck one way or the other, question 8 is C.
Mark the chart, then pick one answer. Put an X in each row that fits each opening type, then check the answer in question 9 for the weakest glazed opening. Attach at least one photo or document for every answer in questions 2 through 9, and initial every page.
Can one visit’s paperwork run itself?
A Tampa buyer often orders the home inspection, a 4-point, a roof form, and this form for the same visit. That’s four forms, dozens of photos, and one payment to chase before closing.
Noma specializes in the Uniform Mitigation Verification Inspection Form (OIR-B1-1802). Upload your inspection agreement once, turn on “Send document when booked,” and the client e-signs it as soon as the visit is booked. Your home inspection report, schedule, invoices, and online payments live in the same place. See how Noma runs inspection jobs.